Development

CommonGrounds Signs 30 KSF Lease in Downtown DC

The coworking company will occupy an entire floor at the Class A office building, marking its first flexible workspace in the market, set to open in early 2020.

ATXI Completes 1st Phase of Mark Twain Transmission Project

Ameren estimates that its total investment in the project—a 96-mile, 345,000-volt transmission line and substation—will reach $250 million.

Longroad Energy Begins Construction on 243MW Wind Farm

El Campo is one of the largest investments ever made in Knox County, with the total cost of the project estimated at $335 million.

Chicago Investors Break Ground on Fulton Market Office Building

Real estate veterans Bob Wislow and Camille Julmy plan to deliver Fulton East, a 12-story office and retail building, by spring 2020.

Music City Office Opens Doors

Panattoni Development demolished the Country Music Association’s former headquarters in 2017 and replaced it with a 107,840-square-foot Class A office.

SPP Breaks Ground on Tampa Office Project

The city’s first downtown trophy office tower in more than 25 years, 1001 Water is part of the 56-acre Water Street Tampa development reshaping the urban waterfront.

Hines Breaks Ground on Seattle-Area Tower, Amazon Is Reported Tenant

The developer has preleased the entire 347,220-square-foot office building in Bellevue, Wash., reportedly to the e-commerce giant. The sustainable property is slated for completion in the fourth quarter of 2020.

Whitman Family Lands $550M Financing for Miami Retail Project

HFF has arranged the loans through MetLife Investment Management. The funds will be used to expand the 463,100-square-foot Bal Harbour Shops luxury property.

Portland Mixed-Use Project Moves Ahead With $460M Loan

George Smith Partners secured the financing for BPM Real Estate Group from an affiliate of Mosaic Real Estate Investors. The 35-story development will bring a five-star hotel, office, residential and retail space.

Dominion Energy Begins Work on Offshore Wind Project

The first phase of construction takes place onshore and consists of the installation of a half-mile conduit that will hold the final stretch of cables connecting two 6 MW turbines.