Industrial
Duke Realty Snags Houston Industrial Project
HFF represented the seller, Mountain West Industrial Properties, in disposing of the 772,500-square-foot, two-building Bayport Distribution Center II, located in Pasadena, Texas.
Tampa-Area Industrial Asset Changes Hands
Compark 75 is a Class A commerce park with five small-bay, light industrial buildings encompassing 285,615 square feet. Cushman & Wakefield facilitated the sale on behalf of the seller.
MFT, Fed One Break Ground on 260 KSF Warehouse in Ohio
This is the second phase of Air South Commerce Center, an industrial project near Columbus that will eventually feature 400,000 square feet.
First Industrial to Build 740 KSF Facility in Central PA
The 738,720-square-foot distribution center will be located adjacent to a 12-acre plot of land where the company plans to build an additional facility.
CRG, Gramercy Deliver SC Pharmaceutical Warehouse
The partnership began building the project for Bausch+Lomb in March. A second phase could double the size of the new 432,000-square-foot facility.
Terreno Nabs 8 CA Industrial Buildings for $28M
The 152,000-square-foot industrial property, containing both distribution and flex buildings, sits near Interstate 105, within 15 miles of downtown Los Angeles.
Bixby Acquires Phoenix Industrial Facility for $10M
Built in 1998, West 10 Business Center is fully-leased to three tenants. The distribution facility is located at 4703 W. Brill St., with direct frontage along Interstate 10.
NAI Facilitates $7M Industrial Sale in GA
The 12-building business park was constructed between 1985 and 1988. Upon closing, the property was 43 percent leased to multiple tenants.
McCraney to Build 610 KSF Spec Building near Charlotte Airport
The company acquired a 54-acre parcel less than one mile from the airport as part of its 2 million-square-foot industrial expansion throughout the Southeast U.S.
Alliant Energy Takes Over 170MW Wind Farm in IA
Through its Iowa utility subsidiary Interstate Power and Light Co., the company will begin construction of the 15,000-acre wind farm in 2018.










