Preferred Storage
FL Self-Storage Project Receives $8M Loan
Walker & Dunlop has arranged the loan, structured with a 10-year term and 12-month construction period. Preferred Storage is expected to be completed in 2018.
Walker & Dunlop has arranged the loan, structured with a 10-year term and 12-month construction period. Preferred Storage is expected to be completed in 2018.