{"id":1004310455,"date":"2019-03-21T09:32:44","date_gmt":"2019-03-21T17:32:44","guid":{"rendered":"https:\/\/www.commercialsearch.com\/news\/?p=1004310455"},"modified":"2021-05-15T04:15:19","modified_gmt":"2021-05-15T12:15:19","slug":"costly-upgrades-loom-for-u-s-transmission-grid","status":"publish","type":"post","link":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/","title":{"rendered":"Costly Upgrades Loom for US Transmission Grid"},"content":{"rendered":"<div id=\"attachment_1004310464\" style=\"width: 310px\" class=\"wp-caption alignright\"><img decoding=\"async\" aria-describedby=\"caption-attachment-1004310464\" data-attachment-id=\"1004310464\" data-permalink=\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/workers_san-diego-gas-electric_800x620\/\" data-orig-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg\" data-orig-size=\"800,620\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;6.3&quot;,&quot;credit&quot;:&quot;Ted Walton&quot;,&quot;camera&quot;:&quot;Canon EOS 5D&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1354184068&quot;,&quot;copyright&quot;:&quot;\\u00a9 2012 Ted Walton Photography&quot;,&quot;focal_length&quot;:&quot;130&quot;,&quot;iso&quot;:&quot;320&quot;,&quot;shutter_speed&quot;:&quot;0.000625&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Workers_San Diego Gas &#038; Electric_800x620\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg?w=800\" loading=\"lazy\" class=\"wp-image-1004310464 size-medium\" src=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg\" alt=\"\" width=\"300\" height=\"233\" srcset=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg 800w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg?resize=300,233 300w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg?resize=768,595 768w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-1004310464\" class=\"wp-caption-text\">San Diego Gas &amp; Electric workers repair power lines. (Photo: San Diego Gas &amp; Electric)<\/p><\/div>\n<p>Demands and changes caused by the increasing <a href=\"https:\/\/www.commercialsearch.com\/news\/electrification-gains-traction-slowly\/\">electrification<\/a> of transportation and heating in the United States will require transmission infrastructure and distribution upgrades totaling $30 billion to $90 billion by 2030 with an additional $200 billion to $600 billion needed between 2030 and 2050.<\/p>\n<p>Those statistics come from a new report prepared by The Brattle Group for WIRES, a trade association that advocates for transmission investment. The study, written by J\u00fcrgen Weiss, Michael Hagerty and Maria Casta\u00f1er, estimates that the number of <a href=\"https:\/\/www.commercialsearch.com\/news\/getting-ready-for-the-ev-station-surge\/\">electric vehicles<\/a> on the road will jump from one million today to seven million by 2025 and increase exponentially from there.<\/p>\n<p>Demand will also come from changes in residential and business heating as more electric heat pumps are used throughout the U.S., not just in warmer climates. The report notes that technology advances could also lead to more electrification of many industrial processes.<\/p>\n<p><em>\u201cThis is a new form of load that is being driven by several things. It\u2019s being driven by policy in certain places aiming to reduce greenhouse emissions. It\u2019s also being driven by consumer preferences,\u201d<\/em> said Hagerty, Brattle Group senior associate and co-author of <em>The Coming of Electrification of the North American Economy: Why We Need a Robust Transmission Grid.<\/em><\/p>\n<p>Based on the average annual transmission investment over the past 10 years, the report projects investment levels would be 20 percent to 50 percent higher through 2030\u2014or about $3 billion to $7 billion more spent each year. Those numbers increase <img decoding=\"async\" data-attachment-id=\"1004310470\" data-permalink=\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/es-1-annual-incremental-transmission-investment_943x500\/\" data-orig-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/ES-1-Annual-Incremental-Transmission-Investment_943x500.png\" data-orig-size=\"943,500\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"ES 1 &#8211; Annual Incremental Transmission Investment_943x500\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/ES-1-Annual-Incremental-Transmission-Investment_943x500.png?w=943\" loading=\"lazy\" class=\"alignleft size-medium wp-image-1004310470\" src=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/ES-1-Annual-Incremental-Transmission-Investment_943x500.png\" alt=\"\" width=\"300\" height=\"159\" srcset=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/ES-1-Annual-Incremental-Transmission-Investment_943x500.png 943w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/ES-1-Annual-Incremental-Transmission-Investment_943x500.png?resize=300,159 300w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/ES-1-Annual-Incremental-Transmission-Investment_943x500.png?resize=768,407 768w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>significantly from 2030 through 2050, requiring a 50 percent to 170 percent increase in transmission investment, or between $7 billion and $25 billion a year. The high electrification numbers are assuming electrification will be powering all transportation and space and water heating needs by 2050.<\/p>\n<p><em>\u201cThe writing on the wall is clear; we\u2019re headed toward a cleaner energy future. The transportation and heating sectors will be electrified\u2014it\u2019s just a matter of when,\u201d<\/em> Brian Gemmell, president of WIRES Group and vice president of transmission and asset management with National Grid, said in a prepared statement<em>. \u201cTransmission is the enabler of our electrified future, so we need to start planning now in order to keep pace with the coming increased demand and to ensure continued reliability of the U.S. electric system.\u201d<\/em><\/p>\n<p>Hagerty noted transmission upgrades can take as long as 10 to 15 years to develop from initial conception to completion and so it is imperative that utilities begin planning upgrades now.<\/p>\n<div id=\"attachment_1004310473\" style=\"width: 310px\" class=\"wp-caption alignright\"><img decoding=\"async\" aria-describedby=\"caption-attachment-1004310473\" data-attachment-id=\"1004310473\" data-permalink=\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/michael_hagerty_840x560\/\" data-orig-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Michael_Hagerty_840x560.jpg\" data-orig-size=\"840,560\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;2.8&quot;,&quot;credit&quot;:&quot;John F Martin&quot;,&quot;camera&quot;:&quot;Canon EOS 5D Mark III&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372181640&quot;,&quot;copyright&quot;:&quot;Copyright 2012\\n(c)John F Martin Photography\\nGrosse Pointe Woods&quot;,&quot;focal_length&quot;:&quot;175&quot;,&quot;iso&quot;:&quot;320&quot;,&quot;shutter_speed&quot;:&quot;0.01&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Michael_Hagerty_840x560\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Michael Hagerty, The Brattle Group&lt;\/p&gt;\n\" data-large-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Michael_Hagerty_840x560.jpg?w=840\" loading=\"lazy\" class=\"size-medium wp-image-1004310473\" src=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Michael_Hagerty_840x560.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Michael_Hagerty_840x560.jpg 840w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Michael_Hagerty_840x560.jpg?resize=300,200 300w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Michael_Hagerty_840x560.jpg?resize=768,512 768w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-1004310473\" class=\"wp-caption-text\">Michael Hagerty, The Brattle Group<\/p><\/div>\n<p><em>\u201cFrom the industry perspective, they\u2019ve been living through a period of very limited demand growth. The load isn\u2019t growing all that much. But the conventional wisdom is that very significant changes are coming up for the next 10 to 30 years,\u201d<\/em> Hagerty told <em>Commercial Property Executive. <\/em><\/p>\n<h2><strong>Lower Rates?<\/strong><\/h2>\n<p>Despite the increased spending required to support electrification growth, the report notes that the overall impact on increased transmission investment is likely to result in modest consumer rate increases and possibly even lower rates. The authors cite three reasons: transmission costs represent a small share of the rates; total investment will be spread over greater electricity demand with electrification; and the higher costs of transmission are likely to be offset by lower generation costs from low-cost renewable resources.<\/p>\n<p>The mix of new generation resources handling increased electrification demand will differ by region due to resource availability, technology costs and policy objectives, according to the WIRES report. For example, in regions like the Pacific coast and Northeast, utilities, states and consumers are increasingly choosing low-cost renewable generation. Those numbers are expected to increase to about 90 percent by 2050.<\/p>\n<p><em>\u201cThe main takeaway for the study is if you don\u2019t think about transmission systems as you are aiming for these high goals, you will either miss the goals or pay a lot more to achieve the goals,\u201d<\/em> Hagerty said of renewable energy goals.<\/p>\n<h2><strong>Grid Modernization Investments<\/strong><\/h2>\n<div id=\"attachment_1004310476\" style=\"width: 310px\" class=\"wp-caption alignright\"><img decoding=\"async\" aria-describedby=\"caption-attachment-1004310476\" data-attachment-id=\"1004310476\" data-permalink=\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/sanem_sergici_720x480\/\" data-orig-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Sanem_Sergici_720x480.jpg\" data-orig-size=\"720,480\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;2&quot;,&quot;credit&quot;:&quot;John F Martin&quot;,&quot;camera&quot;:&quot;Canon EOS 5D Mark III&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1368004638&quot;,&quot;copyright&quot;:&quot;Copyright 2012\\n(c)John F Martin Photography\\nGrosse Pointe Woods&quot;,&quot;focal_length&quot;:&quot;85&quot;,&quot;iso&quot;:&quot;160&quot;,&quot;shutter_speed&quot;:&quot;0.008&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Sanem_Sergici_720x480\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Sanem Sergici, The Brattle Group&lt;\/p&gt;\n\" data-large-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Sanem_Sergici_720x480.jpg?w=720\" loading=\"lazy\" class=\"size-medium wp-image-1004310476\" src=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Sanem_Sergici_720x480.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Sanem_Sergici_720x480.jpg 720w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Sanem_Sergici_720x480.jpg?resize=300,200 300w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-1004310476\" class=\"wp-caption-text\">Sanem Sergici, The Brattle Group<\/p><\/div>\n<p>In a separate report prepared for the National Electrical Manufacturers Association (NEMA), The Brattle Group provides insight into the benefits and cost recovery for several recent grid modernization efforts in the U.S. The report, <em>Reviewing Grid Modernization Investments<\/em>, reviews 21 recent grid projects and offers 10 case studies assessing cost benefits to customers and utilities as well as cost recovery. The projects cover five key areas: distribution infrastructure hardening and resiliency; transmission infrastructure hardening; smart grid and distribution modernization; advanced metering infrastructure (AMI); and <a href=\"https:\/\/www.commercialsearch.com\/news\/demand-response-programs-expand-the-menu\/\">distributed energy resources (DERs).<\/a><\/p>\n<p>During the past decade, several utilities and public commissions have made investments in new technologies, tools and techniques to modernize the grid. NEMA\u2019s goal for the report is to document some of those projects and provide information for utilities and regulators contemplating similar investments so they can learn from the early adopters\u2019 experiences.<\/p>\n<p><em><img decoding=\"async\" data-attachment-id=\"1004310482\" data-permalink=\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/figure-4-electrification-adoption-rates_943x548\/\" data-orig-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Figure-4-Electrification-Adoption-Rates_943x548.png\" data-orig-size=\"943,548\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"Figure 4 &#8211; Electrification Adoption Rates_943x548\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Figure-4-Electrification-Adoption-Rates_943x548.png?w=943\" loading=\"lazy\" class=\"alignleft size-medium wp-image-1004310482\" src=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Figure-4-Electrification-Adoption-Rates_943x548.png\" alt=\"\" width=\"300\" height=\"174\" srcset=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Figure-4-Electrification-Adoption-Rates_943x548.png 943w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Figure-4-Electrification-Adoption-Rates_943x548.png?resize=300,174 300w, https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Figure-4-Electrification-Adoption-Rates_943x548.png?resize=768,446 768w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>\u201cContrary to popular belief, grid modernization efforts are not limited to those conducted in a few states, such as California, Illinois and New York, but are taking place in many states around the country, each starting with its own priorities, such as improved resilience or AMI infrastructure,\u201d<\/em>&nbsp;said Sanem Sergici, Battle principal and the study\u2019s lead author, in a prepared statement. <em>\u201cMost utilities are willing to undertake grid modernization projects, provided they achieve timely cost recovery and an increasing number of regulators are willing to consider alternative regulatory models to enable these projects and broader utility innovation.\u201d<\/em><\/p>\n<p>The report, co-authored by Michelle Li and Rebecca Carroll, notes that while some of the investments were done solely on utility initiatives, most grid modernization efforts were undertaken in response to local or state policy requirements. For some utilities, renewal of their <em>\u201ccustomer engagement strategies\u201d<\/em> was also part of the impetus for investment.<\/p>\n<p>However, even those utilities driven by state initiatives faced just as many hurdles in the regulatory process. In most cases, the regulatory approvals took more than a year<em>\u2014<\/em>13 months on average<em>\u2014<\/em>and were contingent on meeting the required threshold in a typical benefit-cost test such as the Total Resource Cost (TRC) test. Other approaches for cost benefits used included break-even analysis and proof-of-cost prudency.<\/p>\n<p>The majority of the cases relied on cost recovery through general rate filings, although some use formula rates and rate riders to address lags in regulatory approvals. Some jurisdictions also introduced performance-based rates and incentives, particularly for meeting targets for increased utilization of DERs, beneficial electrification and increased system utilization. Brattle researchers expect this trend to continue as the urgency of grid modernization, DER integration and electrification continues.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Infrastructure and distribution upgrades needed to handle increased electrification demands could cost up to $90 billion by 2030 and several times more by 2050.<\/p>\n","protected":false},"author":1068,"featured_media":1004310464,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21786,37301],"tags":[],"class_list":["post-1004310455","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sustainability","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.4 (Yoast SEO v24.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Costly Upgrades Loom for US Transmission Grid - Commercial Property Executive<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Costly Upgrades Loom for US Transmission Grid\" \/>\n<meta property=\"og:description\" content=\"Infrastructure and distribution upgrades needed to handle increased electrification demands could cost up to $90 billion by 2030 and several times more by 2050.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/\" \/>\n<meta property=\"og:site_name\" content=\"Commercial Property Executive\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CPExecutive\" \/>\n<meta property=\"article:published_time\" content=\"2019-03-21T17:32:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-15T12:15:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"620\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Gail Kalinoski\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@cpexecutive\" \/>\n<meta name=\"twitter:site\" content=\"@cpexecutive\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/\",\"url\":\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/\",\"name\":\"Costly Upgrades Loom for US Transmission Grid - Commercial Property Executive\",\"isPartOf\":{\"@id\":\"https:\/\/www.commercialsearch.com\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg\",\"datePublished\":\"2019-03-21T17:32:44+00:00\",\"dateModified\":\"2021-05-15T12:15:19+00:00\",\"author\":{\"@id\":\"https:\/\/www.commercialsearch.com\/news\/#\/schema\/person\/fc5b5df1393e5023d2417bd48c2fda57\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#primaryimage\",\"url\":\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg\",\"contentUrl\":\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg\",\"width\":800,\"height\":620},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.commercialsearch.com\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Costly Upgrades Loom for US Transmission Grid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.commercialsearch.com\/news\/#website\",\"url\":\"https:\/\/www.commercialsearch.com\/news\/\",\"name\":\"Commercial Property Executive\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.commercialsearch.com\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.commercialsearch.com\/news\/#\/schema\/person\/fc5b5df1393e5023d2417bd48c2fda57\",\"name\":\"Gail Kalinoski\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.commercialsearch.com\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2023\/04\/Gail-Kalinoski-headshot.jpeg?w=86\",\"contentUrl\":\"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2023\/04\/Gail-Kalinoski-headshot.jpeg?w=86\",\"caption\":\"Gail Kalinoski\"},\"description\":\"Kalinoski has been a contributing writer to Commercial Property Executive and Multi-Housing News since 2010 and previously wrote for three years for Commercial Property News. Gail has been a freelance writer and editor for more than 20 years, contributing to daily websites, magazines, weekly business newspapers, market intelligence newsletters, research reports, monthly B-to-B and consumer magazines. Earlier in her career, Gail worked for Gannett Corp. as an editor and reporter for 15 years. Gail has a bachelor\u2019s degree in journalism from Pace University.\",\"url\":\"https:\/\/www.commercialsearch.com\/news\/author\/gail-kalinoski\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Costly Upgrades Loom for US Transmission Grid - Commercial Property Executive","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/","og_locale":"en_US","og_type":"article","og_title":"Costly Upgrades Loom for US Transmission Grid","og_description":"Infrastructure and distribution upgrades needed to handle increased electrification demands could cost up to $90 billion by 2030 and several times more by 2050.","og_url":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/","og_site_name":"Commercial Property Executive","article_publisher":"https:\/\/www.facebook.com\/CPExecutive","article_published_time":"2019-03-21T17:32:44+00:00","article_modified_time":"2021-05-15T12:15:19+00:00","og_image":[{"width":800,"height":620,"url":"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg","type":"image\/jpeg"}],"author":"Gail Kalinoski","twitter_card":"summary_large_image","twitter_creator":"@cpexecutive","twitter_site":"@cpexecutive","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/","url":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/","name":"Costly Upgrades Loom for US Transmission Grid - Commercial Property Executive","isPartOf":{"@id":"https:\/\/www.commercialsearch.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#primaryimage"},"image":{"@id":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#primaryimage"},"thumbnailUrl":"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg","datePublished":"2019-03-21T17:32:44+00:00","dateModified":"2021-05-15T12:15:19+00:00","author":{"@id":"https:\/\/www.commercialsearch.com\/news\/#\/schema\/person\/fc5b5df1393e5023d2417bd48c2fda57"},"breadcrumb":{"@id":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#primaryimage","url":"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg","contentUrl":"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg","width":800,"height":620},{"@type":"BreadcrumbList","@id":"https:\/\/www.commercialsearch.com\/news\/costly-upgrades-loom-for-u-s-transmission-grid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.commercialsearch.com\/news\/"},{"@type":"ListItem","position":2,"name":"Costly Upgrades Loom for US Transmission Grid"}]},{"@type":"WebSite","@id":"https:\/\/www.commercialsearch.com\/news\/#website","url":"https:\/\/www.commercialsearch.com\/news\/","name":"Commercial Property Executive","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.commercialsearch.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.commercialsearch.com\/news\/#\/schema\/person\/fc5b5df1393e5023d2417bd48c2fda57","name":"Gail Kalinoski","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.commercialsearch.com\/news\/#\/schema\/person\/image\/","url":"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2023\/04\/Gail-Kalinoski-headshot.jpeg?w=86","contentUrl":"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2023\/04\/Gail-Kalinoski-headshot.jpeg?w=86","caption":"Gail Kalinoski"},"description":"Kalinoski has been a contributing writer to Commercial Property Executive and Multi-Housing News since 2010 and previously wrote for three years for Commercial Property News. Gail has been a freelance writer and editor for more than 20 years, contributing to daily websites, magazines, weekly business newspapers, market intelligence newsletters, research reports, monthly B-to-B and consumer magazines. Earlier in her career, Gail worked for Gannett Corp. as an editor and reporter for 15 years. Gail has a bachelor\u2019s degree in journalism from Pace University.","url":"https:\/\/www.commercialsearch.com\/news\/author\/gail-kalinoski\/"}]}},"jetpack_featured_media_url":"https:\/\/www.commercialsearch.com\/news\/wp-content\/uploads\/sites\/46\/2019\/03\/Workers_San-Diego-Gas-Electric_800x620.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/posts\/1004310455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/users\/1068"}],"replies":[{"embeddable":true,"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/comments?post=1004310455"}],"version-history":[{"count":7,"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/posts\/1004310455\/revisions"}],"predecessor-version":[{"id":1004533249,"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/posts\/1004310455\/revisions\/1004533249"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/media\/1004310464"}],"wp:attachment":[{"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/media?parent=1004310455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/categories?post=1004310455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.commercialsearch.com\/news\/wp-json\/wp\/v2\/tags?post=1004310455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}